SDAC Fallback Manual

23 September 2025

 

Publication of the SDAC Fallback Manual

 

The Single Day-Ahead Coupling (SDAC) Fallback Manual is now available and can be accessed on the NEMO Committee and ENTSO-E websites.

 

Developed jointly by Nominated Electricity Market Operators (NEMOs) and Transmission System Operators (TSOs), the manual provides detailed guidance on procedures to be applied in the event of a SDAC partial or full decoupling.

It sets out key elements including communication channels, fallback processes, and the updated operational timelines associated with the introduction of the 15-minute Market Time Unit.

The SDAC Fallback Manual will be applicable as of 30 September and is intended to support market participants in ensuring preparedness and continuity in exceptional circumstances.

 

Fallback Manual

 

© 2025 Energy Exchange Austria | Abwicklung für Energieprodukte AG
Site by VERDINO